After placing an engine in an M.V.P envelope
- check humidity indicator after 12 hours.
- check humidity indicator after 24 hours.
- check humidity indicator after 48 hours.
Explanation from PART66Online
After sealing an engine in a marine vapour-proof (MVP) envelope the humidity indicator is allowed to settle and is checked after about 24 hours to confirm the desiccant has dried the trapped air to a safe level before the longer periodic checks begin.
titanas20 asked · 4 Dec 2012
What is M.V.P?
Community Comments (1)
Please Sign In to post a comment.
More discussions in 15. Gas turbine engine
- On a (VP) cocoon bag, if the humidity indicator turns pink/lilac
- To inhibit the fuel system of an installed engine for storage, with inhibiting oil supplied to the fuel inlet, you should
- Small cuts in a M.V.P. engine storage bag can be repaired
- When a volume of air is compressed
- In a choked nozzle, velocity increases, and
- The propulsive efficiency is