Welcome Back

Sign in to your PART66Online account

or use email
Forgot password?

Don't have an account? Register here

Module 5. Digital techniques / Electronic instrument systems

A BITE check for automatic performance and fault monitoring is carried out when?

  • Power-up self test.
  • On engine shutdown.
  • During flight mode.

Explanation

Automatic performance and fault-monitoring BITE includes a self-test that runs when the system is powered up, checking the unit is serviceable before it is relied upon. This power-up test complements any continuous monitoring and is the recognised point at which the automatic self-check is performed.

khalifa asking:

i dont understand what is the problem in above massage?

Community Comments (6)

D
dimky Posts: 514 19.09.2013 / 13:08
What wrong?
K
khalifa Posts: 3 19.09.2013 / 13:10
i have been chosen the answer but its gave me wrong
R
ramesh321 Posts: 8 22.09.2013 / 12:56
it is correct answer.nothing is wrong in it
K
khalifa Posts: 3 23.09.2013 / 10:37
thanks for everyone for helped me in this question
A
aviatoradil Posts: 4 18.10.2014 / 13:09
Example: when u start refueling and open IRP system will performe bite test first for automatic performance and fault monitoring.hope u got what is being asked in question KHALIFA....
A
aviatoradil Posts: 4 18.10.2014 / 13:11
Example: when u start refueling and open IRP system will performe bite test first for automatic performance and fault monitoring.hope u got what is being asked in question KHALIFA.... Power up self test is correct answer

Please Sign In to post a comment.

We use essential cookies to keep you signed in, plus anonymous analytics to understand how the site is used. Cookie-based analytics is set only with your consent. See our Privacy & Cookie Policy.