Welcome Back

Sign in to your PART66Online account

or use email
Forgot password?

Don't have an account? Register here

Q&A Forum

1131 questions found

Module 10. Aviation legislation

On completion of a major modification to an EASA aircraft, for the purposes of a flight test

  • issue a Certificate of Fitness to Fly since the C of A has been invalidated.
  • the C of A is valid providing it is still within the date shown on it.
  • issue a Permit to Fly.
nazifong asking:

As we all know major modification will require investigation by CAA because it affects performance, handling or limitation of the aircraft. So, C of A will automatically becomes invalid, thus Coff under 'A' condition is needed. But if the modification changes the Type Status, then it must fly under 'B' condition and a certificate of clearance is needed.

Module 3. Electrical fundamentals

A 200 volt motor is taking 10 amperes armature current, the armature resistance is 0.1 ohm. The Back- EMF under these conditions will be

  • 201 volts.
  • 199 volts.
  • 1 volt.
arifadli8 asking:

How???

Module 3. Electrical fundamentals

In a Desynn indicator system, the rotor is

  • an electromagnet.
  • a permanent magnet.
  • an AC magnet.
arifadli8 asking:

This is the first time i heard.,,

Module 3. Electrical fundamentals

Which is a high-pass filter?

  • L type with series L and shunt C.
  • L type with series C and shunt L.
  • Π type with series C and L.
arifadli8 asking:

i dont understand that symbol...

Module 3. Electrical fundamentals

Transformer copper loss on full load is 220 Watts. On half load the loss will be

  • 440 Watts.
  • 110 Watts.
  • 55 Watts.
arifadli8 asking:

How???

We use essential cookies to keep you signed in, plus anonymous analytics to understand how the site is used. Cookie-based analytics is set only with your consent. See our Privacy & Cookie Policy.